Adding a Resource Group to an Existing iBIS Menu

This topic will guide you through the process of adding a new Resource Group to another existing Resource Group. New Resource Groups can be assigned directly to the iBIS home menu Resource Group (ibis_home_menu) or to any other existing Resource Group. You must be logged into iTopia as the system user in order to complete the steps outlined in this topic.

This topic assumes that you are working with a new Resource Group and that you want to add the new Resource Group to the main iBIS menu. Note: You can add Group Resources to any other existing Group Resource within the iBIS menu system.

  1. Signed on as the system user, open the Resource Master-Group Item view by:

    • Entering resource_group in the Search field and then clicking Go.
      OR
    • Selecting 'Resource Master-Group Item' from Master Tables menu found under the User Management System (UMS) on the main menu.

  2. Click Create on the Resource Master-Group Item view (found in the bottom right corner of the view).

  3. A new Resource Master-Group Item view opens. There are 2 blank fields:

    • Parent Resource Name - enter or select from the lookup the Resource Group name you want to be the Parent resource. This is the folder that will contain the Individual Resource(s) and/or other Resource Groups.

    • Child Resource Name - enter or select from the lookup the Resource Name (Individual or Group) that you want to appear under the Parent Resource Name.

Here is an example of the 'Resource Master-Group Items' view:

Grp Res to Main Menu
Adding a new Group Resource to the main IBIS menu (also a Group Resource)

  1. Click Continue.

  2. A second Resource Master-Group Item page displays. This page contains 2 fields that require input:

    • Sequence - enter the sequence number in which you wish the Child Resource to be displayed within the Parent Resource. If this is a new Group Resource (Parent Resource), the sequence number defaults to 1. As subsequent Child Resources are added to the Parent Resource, the sequence number automatically increases. Once several Child Resources are added to a Parent Resource, you can re-sequence the children as required.

      • If the Parent Resource already contains several other Resources, the sequence number will not be equal to 1. If you do not change the sequence number, the resource will be placed in the last position within the Parent Resource.

    • Launch Mode - select from the drop down list the desired Launch Mode. The Launch Mode controls how the view is launched in the browser when the view is selected. The default Launch Mode is '3-As Specified by User'. This option defaults to the Launch Mode selected by the user's browser settings, but can be overridden by selecting either '1-In Same Window' or 2-In Separate Window'. In this case, we will leave the default setting.

      Here is an example of the second 'Resource Master-Group Item' page:

      Grp Res to Main Menu
      Selecting a Sequence and Launch Mode

  3. When the information is entered, click Submit.

  4. You are returned to the Resource Master-Group Item page that contains the Parent and Child Resource Name fields. At this point you can continue to add Child Resources to the Parent Resource or close the Resource Master-Group Item view.

 